Handing-Over of Katibunga Wirtschaftshof

On Friday 5 November the project of the Katibunga farmyard (Wirtschaftshof) was handed over by the Lwanga Construction Ltd. to the brothers of Katibunga. The prior, Fr. W. Nzota expressed happiness and gratefulness that the building of the farmyard has been finalized to a very good standard.

Seen from the Road

Seen from the Road

The Inspection Team

The Inspection Team

In 2007 the building of the “wirtschaftshof” stopped due to various reason and stood idle. With the help of the Mother Monastery St. Ottilien in Bavaria (Germany)  and with the Diocese of Mpika the building is now ready to be used. Already 290 bags of Maize are stored in the new Warehouse, in two rooms onions from the fileds of the brothers are drying. The big 50 KVA generator from Priory has been transferred to the new place. All is ready to be put to use. A big: Thank You goes to the building company Lwanga Construction Ltd. with its Manager Mrs. Mwada Tonga and project Manager Mr. Andrew Nyoka for the excellent finishing of this challenging job. During the speeches the hope was expressed that this Farmyard will go a long way in providing eductaion and tools for the people of Katibunga and the diocese as a whole.